Prove it on your own infrastructure.
€4,000 flat · 25–100 sites · credited in full on conversion to any paid plan. No bespoke features during the proof; one integration path (SSO).
Success criteria: lossless backfill verified across 30/60/120-minute unplug windows + NIS2 evidence pack exported with a reproducible hash. If a criterion fails, you don't roll out — that's the point.
The 7-day evaluation script (published, no surprises)
- Day 1: Install the agent on 3 sites; verify heartbeat, inventory, RBAC, and audit log.
- Day 3: Unplug the WAN for 30/60/120 minutes; verify lossless backfill.
- Day 5: Generate the NIS2 evidence export; verify the reproducible hash.
- Day 7: Debrief with the artifact checklist; stakeholder sign-off (CIO/IT Ops + DPO).
Day-0 requirement: site list, IPs, credentials, and contacts delivered, plus CIO/IT Ops and DPO sign-off on the success criteria. Same preconditions as our published 7-day export promise.
Not sure you're ready? Request a readiness scorecard.
Tell us about your edge infrastructure and we'll send back an evidence-readiness scorecard, an indicative pre-assessment, within one business day.
Email us your company, number of edge sites, and industry, and we'll prepare your scorecard. We're moving this to a self-serve form on our own EU infrastructure; until then we handle it by email so your details never leave the EU.
Request your scorecardThe scorecard is an indicative pre-assessment, not legal advice.
Frequently Asked Questions
Is there a free trial?
No. Download the sample evidence pack and verify its hash — that shows exactly what the product produces. Hands-on validation happens in the pilot, which is credited in full when you convert.
What if a success criterion fails?
Then you don't roll out, and we go fix the product before asking anyone else to evaluate it. The pilot exists to make the promise falsifiable on your infrastructure, not ours.
We have fewer than 25 sites — can we still pilot?
The pilot is designed for 25–100 sites, where fleet-scale evidence flow is actually worth proving. Below that, start with the sample evidence pack and the Eval band, or talk to us — and if you have fewer than 5 sites, we'll honestly tell you Verity Edge probably isn't the right fit yet.
Who needs to be involved on our side?
Day 0: CIO or IT Ops lead plus your DPO sign off on scope and success criteria. During the pilot: one technical contact for the 3-site install. Day 7: the same stakeholders for the debrief.